LEED
Continuous LEED evidence from your existing sensors. Real-time monitoring of indoor air quality, energy performance, and thermal comfort.
The audit problem
LEED is a credit-and-prerequisite framework. The Operations & Maintenance scheme expects continuous performance, but most teams treat it as a recertification event. The result: capital projects whose continuous evidence quietly disappears 90 days after substantial completion.
Prerequisites & credits
Continuous ventilation rate evidence.
CO₂ and VOC monitoring across zones.
Continuous building-level energy use.
End-use sub-metering and ongoing monitoring.
Continuous water-use tracking.
Operative temperature in target range.
What you get
Every LEED threshold watched continuously, per zone.
When a threshold breaches, the queue knows immediately.
CSV / PDF / portal export tailored to the LEED reviewer.
Speaks LEED's vocabulary — credits, prerequisites — out of the box.
Worked example
A US-based portfolio under LEED O+M: ongoing-performance evidence for IAQ, ventilation, and energy use was exported directly into the recertification submission. The assessor signed off on the continuous-monitoring credits in a single review pass.
Bring your LEED criteria. We'll show you live continuous coverage in 20 minutes.